summaryrefslogtreecommitdiff
authornatronics <natronics@web>2013-07-01 06:01:56 (GMT)
committer wiki <iki-wiki@psas.svcs.cs.pdx.edu>2013-07-01 06:01:56 (GMT)
commit035ca44a5dbceb6a9bcb7a3b8b721e9baaedac79 (patch) (side-by-side diff)
treee08267a7df4f96e8668996769121d4c4346edce4
parent901a0d77af80441c8238d37257cabfaf02b64336 (diff)
downloadwiki-035ca44a5dbceb6a9bcb7a3b8b721e9baaedac79.zip
wiki-035ca44a5dbceb6a9bcb7a3b8b721e9baaedac79.tar.gz
Noted that we actually launched.
Diffstat (more/less context) (ignore whitespace changes)
-rw-r--r--launch10.mdwn75
1 files changed, 2 insertions, 73 deletions
diff --git a/launch10.mdwn b/launch10.mdwn
index 3fa5b7a..31f15bb 100644
--- a/launch10.mdwn
+++ b/launch10.mdwn
@@ -2,26 +2,7 @@
[[!img LV2.3-October.png alt="L-10 Mission patch" class="picture"]]
-<span style="font-size:2.4em;">Launch Date: Sunday June 30th, 2013</span>
-
-<div style="font-size:2.0em;">
- <script language="JavaScript">
- TargetDate = "06/30/2013 10:00 AM";
- BackColor = "white";
- ForeColor = "black";
- CountActive = true;
- CountStepper = -1; //in seconds
- LeadingZero = true;
- DisplayFormat = "L -%%D%% Days, %%H%% Hours, %%M%% Minutes, %%S%% Seconds.";
- //DisplayFormat = "L -%%D%% Days, %%H%% Hours";
- FinishMessage = "Launch Day";
- </script>
- <script language="JavaScript" src="/countdown.js"></script>
-</div>
-
-Launch weekend is here!
-
-_Current status: Last minute insanity._
+On June 30th 2013 PSAS conducted our tenth launch "L-10" with our LV2.3 launch vehicle.
[[!toc levels=3]]
@@ -210,58 +191,6 @@ Sun | Afternoon | Recovery, debrief, pack, drive back to PDX
Sun | Evening | Unload rocket stuff at Dave's house.
"""]]
-## Things to do before launch:
-
-#### Do Early:
-
- - <del>Full communications test</del>
- - <del>Launch Tower Computer test</del>
- - <del>Rocket Tracks programming (RT Crew)</del> Not this launch
- - <del>System Integration/Dress Rehearsal</del>
- - <del>Fix generator</del> (done, daves generator, working reliably as of June, successfully tested and used during tower prep)
- - <del>Get camera module (Dave)</del>
-
-#### Do closer to launch:
-
- - <del>Clean NSR and reafix</del>
- - <del>Reload line cutters (Dave - Done June 10, 2013)</del>
- - <del>Pack chutes</del>
-
-
-#### <del>Dress Rehearsal Saturday 11:00am at Dave's House</del>
-
-### Friday Before Launch
-
-1:00 pm at DC
-
-5 people to pull down tower and pack tools.
-
-
-## Rides and Arrival Logistics
-
-Packing at Dave's house Friday Night 5:30 pm.
-
-Meet at the Dave's house at 8:00 am Saturday, departing at 8:30 am.
-
-People Driving (Saturday):
-
- - Dave
- - David
- - Casey (2)
- - Gavin (2)
- - Ian
-
-People Needing Rides:
-
- - Nathan
- - Jenner
- - Don Park
- - Jamey + Sarah
-
-Sunday Arrivals:
-
- - Kenny
-
-## Procedures:
+Note, launch actually occurred at 12:30, an hour and a half late.
**See the [[Procedure Book for this launch|https://github.com/psas/procedure-book]]**