summaryrefslogtreecommitdiff
authorandrew <andrew@web>2013-04-05 06:33:06 (GMT)
committer wiki <iki-wiki@psas.svcs.cs.pdx.edu>2013-04-05 06:33:06 (GMT)
commitd6230701e32875c42f95b699fa9990652d1500a9 (patch) (side-by-side diff)
treec9cc14d99a68e012cdc5dbea367ca687cae652f9
parent4ee2c2911dab8aaad91bf1e4fe481e02f449b9a5 (diff)
downloadwiki-d6230701e32875c42f95b699fa9990652d1500a9.zip
wiki-d6230701e32875c42f95b699fa9990652d1500a9.tar.gz
Updated date.
Diffstat (more/less context) (ignore whitespace changes)
-rw-r--r--launch10.mdwn28
1 files changed, 14 insertions, 14 deletions
diff --git a/launch10.mdwn b/launch10.mdwn
index 552d7d6..61ab942 100644
--- a/launch10.mdwn
+++ b/launch10.mdwn
@@ -2,11 +2,11 @@
[[!img LV2.3-October.png alt="L-10 Mission patch" class="picture"]]
-<span style="font-size:2.0em;">Proposed Launch Date: Sunday June 2nd, 2013</span>
+<span style="font-size:2.0em;">Proposed Launch Date: Sunday June 30th, 2013</span>
<div style="font-size:2.5em;">
<script language="JavaScript">
- TargetDate = "06/2/2013 9:00 AM";
+ TargetDate = "06/30/2013 9:00 AM";
BackColor = "white";
ForeColor = "black";
CountActive = true;
@@ -87,12 +87,12 @@ _Current status: mild tension._
[[!table data="""
Date | Activity
-Sun 4/28 | Integration day @ Dave's house (?) / Code + feature freeze
+Sun 6/02 | Integration day @ Dave's house (?) / Code + feature freeze
|
-Sun 5/26 | Final prep and integration test day @ Dave's house / Final Checklist
+Sun 6/16 | Final prep and integration test day @ Dave's house / Final Checklist
|
-Tue 5/28 | Go/No Go decision, final logistics, etc.
-Thu 5/30 | Weather last call
+Tue 6/25 | Go/No Go decision, final logistics, etc.
+Thu 6/27 | Weather last call
"""]]
@@ -101,14 +101,14 @@ Thu 5/30 | Weather last call
[[!table data="""
Date | Time | Activity
-Fri 6/01 | Evening | Prep equipment and pack up toy hauler at Dave's house.
-Sat 6/02 | Morning | Depart from Dave's house for Brothers.
-Sat 6/02 | Afternoon | Arrive in Brothers, set up launch tower, prep rocket for flight, watch other people's rockets.
-Sat 6/02 | Evening | Final tower and LTC assembly and testing, final rocket assembly. Astronomy, after the moon goes down.
-Sun 6/02 | Early | Rocket to pad, final system testing before flight.
-Sun 6/02 | 9:00am | Launch!
-Sun 6/02 | Afternoon | Recovery, debrief, pack, drive back to PDX
-Sun 6/02 | Evening | Unload rocket stuff at Dave's house.
+Fri 6/28 | Evening | Prep equipment and pack up toy hauler at Dave's house.
+Sat 6/29 | Morning | Depart from Dave's house for Brothers.
+Sat 6/29 | Afternoon | Arrive in Brothers, set up launch tower, prep rocket for flight, watch other people's rockets.
+Sat 6/29 | Evening | Final tower and LTC assembly and testing, final rocket assembly. Astronomy, after the moon goes down.
+Sun 6/30 | Early | Rocket to pad, final system testing before flight.
+Sun 6/30 | 9:00am | Launch!
+Sun 6/30 | Afternoon | Recovery, debrief, pack, drive back to PDX
+Sun 6/30 | Evening | Unload rocket stuff at Dave's house.
"""]]