summaryrefslogtreecommitdiff
path: root/launch10.mdwn
authornatronics <natronics@web>2013-05-22 06:24:15 (GMT)
committer wiki <iki-wiki@psas.svcs.cs.pdx.edu>2013-05-22 06:24:15 (GMT)
commit0d7359b7f3b74421687b22f5d743967a269224d0 (patch) (side-by-side diff)
treee0e66fc31340d8aa977070d38d6b19de2cc4abc4 /launch10.mdwn
parentb2ece382a4b1b9c7939471a4b313e6e53e7b9b2b (diff)
downloadwiki-0d7359b7f3b74421687b22f5d743967a269224d0.zip
wiki-0d7359b7f3b74421687b22f5d743967a269224d0.tar.gz
Some updates
Diffstat (limited to 'launch10.mdwn') (more/less context) (ignore whitespace changes)
-rw-r--r--launch10.mdwn62
1 files changed, 24 insertions, 38 deletions
diff --git a/launch10.mdwn b/launch10.mdwn
index 2392747..9be848b 100644
--- a/launch10.mdwn
+++ b/launch10.mdwn
@@ -1,10 +1,10 @@
-# L-10 Summer 2013
+# PSAS Launch-10 Summer 2013
[[!img LV2.3-October.png alt="L-10 Mission patch" class="picture"]]
-<span style="font-size:2.0em;">Proposed Launch Date: Sunday June 30th, 2013</span>
+<span style="font-size:2.4em;">Launch Date: Sunday June 30th, 2013</span>
-<div style="font-size:2.5em;">
+<div style="font-size:2.0em;">
<script language="JavaScript">
TargetDate = "06/30/2013 9:00 AM";
BackColor = "white";
@@ -12,8 +12,8 @@
CountActive = true;
CountStepper = -100; //inseconds
LeadingZero = true;
- //DisplayFormat = "L -%%D%% Days, %%H%% Hours, %%M%% Minutes, %%S%% Seconds.";
- DisplayFormat = "L -%%D%% Days, %%H%% Hours";
+ DisplayFormat = "L -%%D%% Days, %%H%% Hours, %%M%% Minutes, %%S%% Seconds.";
+ //DisplayFormat = "L -%%D%% Days, %%H%% Hours";
FinishMessage = "Launch Day";
</script>
<script language="JavaScript" src="/countdown.js"></script>
@@ -21,7 +21,7 @@
There are only <span id="tuesdays">?</span> regular Tuesday night meetings until launch!
-_Current status: mild tension._
+_Current status: Full Panic._
[[!toc levels=4]]
@@ -35,11 +35,6 @@ _Current status: mild tension._
- 8 port 100Mbps Ethernet switch
- Umbilical interface and battery charger
-#### Battery Board
-
- - Charge Balance
- - Fuel Gauge
-
#### Olimex STM32-E407 based IMU with Ethernet
#### Olimex STM32-E407 based roll control with Ethernet
@@ -47,58 +42,51 @@ _Current status: mild tension._
#### LTC API
- And Ground software
- - Awesome launch button
- No gel cel for ignition (liPo instead)
#### Roll Control on FC
#### FC Rocket Ready based on real contstraints
- - Requirements Documentation
-
+ -
#### RocketTracks
- Stretch goal?
-#### Baro sensor
-
-#### Test ground side electronics, RasPi
+#### Update Camera
-#### GPS RF Front End
+#### 3D Printed Connectors
-#### Update Camera
### Technical Nitpicks
- - Test Umbilical?
- - Shorten signal pins?
- - More thought out cabling
- - Standard wires?
- - Test GPS
- - Connectors
- - 3D Print?
- - USB connector on Alpha
- - LTC shutdown cleanly
+ - More thoroughly test GPS
+ - Ground systems test (antennas, wifi)
+ - Integration test
+ - FCF test
# Logistics
## Pre-launch Timeline
+Here is the timeline circa May 21st, 2013:
+
+
+
[[!table data="""
Date | Activity
-Sun 6/02 | Integration day @ Dave's house (?) / Code + feature freeze
- |
-Sun 6/16 | Final prep and integration test day @ Dave's house / Final Checklist
- |
+Sat 6/08 | Integration day 1 @ Dave's house Raise Tower
+Sat 6/22 | Final prep and integration test day @ Dave's house / Final Checklist
Tue 6/25 | Go/No Go decision, final logistics, etc.
Thu 6/27 | Weather last call
+Sat 6/29 | Drive to Brothers
+Sun 6/30 | Launch!!
"""]]
## Launch weekend timeline
-
[[!table data="""
Date | Time | Activity
Fri 6/28 | Evening | Prep equipment and pack up toy hauler at Dave's house.
@@ -106,27 +94,25 @@ Sat 6/29 | Morning | Depart from Dave's house for Brothers.
Sat 6/29 | Afternoon | Arrive in Brothers, set up launch tower, prep rocket for flight, watch other people's rockets.
Sat 6/29 | Evening | Final tower and LTC assembly and testing, final rocket assembly. Astronomy, after the moon goes down.
Sun 6/30 | Early | Rocket to pad, final system testing before flight.
-Sun 6/30 | 9:00am | Launch!
+Sun 6/30 | 10:00am | Launch!
Sun 6/30 | Afternoon | Recovery, debrief, pack, drive back to PDX
Sun 6/30 | Evening | Unload rocket stuff at Dave's house.
"""]]
-
## Things to do before launch:
### ASAP!:
1. TBD
-
+
### Do Early:
- <del>Full communications test</del>
- Launch Tower Computer test
- - Rocket Tracks electronics (Andrew)
- Rocket Tracks programming (RT Crew)
- System Integration/Dress Rehearsal
- Fix generator (Generator? which generator?)
- - Get camera module (Frank)
+ - Get camera module (Dave)
### Do closer to launch: