summaryrefslogtreecommitdiff
path: root/launch10.mdwn
authorandrew <andrew@web>2012-09-15 19:55:14 (GMT)
committer wiki <iki-wiki@psas.svcs.cs.pdx.edu>2012-09-15 19:55:14 (GMT)
commit581ad8dfb60fe91cbeaac938dff3c02ddc64b8c3 (patch) (side-by-side diff)
tree2fccd522f0610be83eaa5d90254253bb4e6db643 /launch10.mdwn
parent8b571502e45447acf9275178284419de05e37bf9 (diff)
downloadwiki-581ad8dfb60fe91cbeaac938dff3c02ddc64b8c3.zip
wiki-581ad8dfb60fe91cbeaac938dff3c02ddc64b8c3.tar.gz
More details, with timeline
Diffstat (limited to 'launch10.mdwn') (more/less context) (ignore whitespace changes)
-rw-r--r--launch10.mdwn60
1 files changed, 49 insertions, 11 deletions
diff --git a/launch10.mdwn b/launch10.mdwn
index d38fb37..e555eff 100644
--- a/launch10.mdwn
+++ b/launch10.mdwn
@@ -2,9 +2,9 @@
[[!img LV2.3-October.png alt="L-10 Mission patch" class="picture"]]
-Primary Date: October 20-21 (in Central Oregon)
+**Date:** October 20-21 (in Central Oregon)
-Countdown:
+**Goals:** Launch LV2 with current roll control system along with new Atom flight computer, GPS, IMU, 802.11a WiFi, 2.4 GHz ATV and camera assembly.
<div style="font-size:2.0em">
<script language="JavaScript">
@@ -22,6 +22,49 @@ Countdown:
# Logistics
+## Pre-launch Timeline
+
+From [[last week's meeting notes|news/2012-09-112/]]:
+
+[[!table header="column" data="""
+Date | Activity
+Tue 09/11 | Launch date decision
+Fri 09/14 | Communication test day (success!)
+ |
+Tue 09/18 | TBD
+Fri 09/21 | Backup communication test day, LTC build day (Andrew out)
+Sun 09/23 | Move rocket bits from Tim's to Dave's house
+ |
+Tue 09/25 | TBD (Andrew out)
+Fri 09/28 | LTC build/integration day
+ |
+Tue 10/02 | FC done, LTC done, payload module done
+Fri 10/05 | 1st integration test day @ Dave's house (Feature freeze, write checklists, 1st rocket/LTC integration, launch rocket with lightbulb, shore power, rocketready, etc) <br /> Whatever isn't ready, we're not going to fly: feature freeze.
+ |
+Tue 10/09 | Recovery system prep completed
+Fri 10/12 | Integration test day @ Dave's house (Full comms integration day @ Tim's house)<br /> Final Checklist / Code freeze
+ |
+Tue 10/16 | Go/No Go decision, final logistics, etc.
+Thu 10/18 | Weather last call
+"""]]
+
+
+## Launch weekend timeline
+
+
+[[!table data="""
+Date | Time | Activity
+Fri 10/19 | Evening | Prep equipment and pack up toy hauler at Dave's house.
+Sat 10/20 | Morning | Depart from Dave's house for Brothers.
+Sat 10/20 | Afternoon | Arrive in Brothers, set up launch tower, prep rocket for flight, watch other people's rockets.
+Sat 10/20 | Evening | Final tower and LTC assembly and testing, final rocket assembly. Astronomy, after the moon goes down.
+Sun 10/21 | Morning | Rocket to pad, final system testing before flight. Those doing a single day launch leave from PDX.
+Sun 10/21 | Noon | Launch!
+Sun 10/21 | Afternoon | Recovery, debrief, pack, drive back to PDX
+Sun 10/21 | Evening | Unload rocket stuff at Dave's house.
+"""]]
+
+
## Things to do before launch:
### ASAP!:
@@ -30,24 +73,19 @@ Countdown:
1. <del>CAN and USB latency testing (Dave+Andrew)</del>
1. <del>Have Chute Bag resown or rebuilt (Tim)</del>
1. <del>Motor bulkhead adapter update solid models based on new motor casing dimensions.</del>
- 1. Create flight computer software wrapper for roll control (?)
- 1. Verify CAN interrupts in flight computer (?)
-
+
### Do Early:
- - Full communications test
+ - <del>Full communications test</del>
- Launch Tower Computer test
- Rocket Tracks electronics (Andrew)
- Rocket Tracks programming (RT Crew)
- System Integration/Dress Rehearsal
- - Fix generator
+ - Fix generator (Generator? which generator?)
+ - Get camera module (Frank)
### Do closer to launch:
- Clean NSR and reafix (Dan)
- Reload line cutters (Dave)
- Pack chutes (Tim)
-
-### Lower priority:
-
- - Get camera module (Frank)