summaryrefslogtreecommitdiff
path: root/launch10.mdwn
authorandrew <andrew@web>2013-02-13 22:58:07 (GMT)
committer wiki <iki-wiki@psas.svcs.cs.pdx.edu>2013-02-13 22:58:07 (GMT)
commitbd0a1f66c810e1d44dda4b2cac6e0aca5255ba36 (patch) (side-by-side diff)
tree0f40c5ce550fc8dfb912aa36dc365746516f1723 /launch10.mdwn
parent4c0a73e983c190f362f8cd7830c5e59c830626b5 (diff)
downloadwiki-bd0a1f66c810e1d44dda4b2cac6e0aca5255ba36.zip
wiki-bd0a1f66c810e1d44dda4b2cac6e0aca5255ba36.tar.gz
Semi-updated launch
Diffstat (limited to 'launch10.mdwn') (more/less context) (ignore whitespace changes)
-rw-r--r--launch10.mdwn72
1 files changed, 27 insertions, 45 deletions
diff --git a/launch10.mdwn b/launch10.mdwn
index 4b89cec..441d402 100644
--- a/launch10.mdwn
+++ b/launch10.mdwn
@@ -1,27 +1,26 @@
-# L-10 Spring 2013
+# L-10 Summer 2013
[[!img LV2.3-October.png alt="L-10 Mission patch" class="picture"]]
-**Date:** TBD Spring 2013
+**Launch Date:** Sunday June 2nd, 2013
## Improvement Goals for Spring
### Major Initiatives
- - Power Distribution Board
- - Break out V_Bat to all subsystems
- - break out comms (CAN, USB) as well
- - Enable pins?
+ - "Roccknet" Data and Power Distribution Board (ECE Capstone course)
+ - STM32-controlled power switches
+ - 8 port 100Mbps Ethernet switch
+ - Umbilical interface and battery charger
- Battery Board
- Charge Balance
- Fuel Gauge
- - CAN implementation for IMU
+ - Olimex STM32-E407 based IMU with Ethernet
+ - Olimex STM32-E407 based roll control with Ethernet
- LTC API
- And Ground software
- Awesome launch button
- - No gel cel
- - Ground Software
- - Build PSAS MCC
+ - No gel cel for ignition
- Roll Control on FC
- FC Rocket Ready based on real contstraints
- Requirements Documentation
@@ -46,7 +45,7 @@
<div style="font-size:1.3em">
<script language="JavaScript">
- TargetDate = "05/15/2013 12:01 PM";
+ TargetDate = "06/2/2013 9:00 AM";
BackColor = "white";
ForeColor = "black";
CountActive = true;
@@ -63,28 +62,14 @@
## Pre-launch Timeline
-From [[last week's meeting notes|news/2012-09-112/]]:
-
[[!table header="column" data="""
-Date | Activity
-Tue 09/11 | Launch date decision
-Fri 09/14 | Communication test day (success!)
- |
-Tue 09/18 | TBD
-Fri 09/21 | Backup communication test day, LTC build day (Andrew out)
-Sun 09/23 | Move rocket bits from Tim's to Dave's house
- |
-Tue 09/25 | TBD (Andrew out)
-Fri 09/28 | LTC build/integration day
- |
-Tue 10/02 | FC done, LTC done, payload module done
-Fri 10/05 | 1st integration test day @ Dave's house (Feature freeze, write checklists, 1st rocket/LTC integration, launch rocket with lightbulb, shore power, rocketready, etc) <br /> Whatever isn't ready, we're not going to fly: feature freeze.
- |
-Tue 10/09 | Recovery system prep completed
-Fri 10/12 | Integration test day @ Dave's house (Full comms integration day @ Tim's house)<br /> Final Checklist / Code freeze
- |
-Tue 10/16 | Go/No Go decision, final logistics, etc.
-Thu 10/18 | Weather last call
+Date | Activity
+Sun 4/28 | Integration day @ Dave's house (?) / Code + feature freeze
+ |
+Sun 5/26 | Final prep and integration test day @ Dave's house / Final Checklist
+ |
+Tue 5/28 | Go/No Go decision, final logistics, etc.
+Thu 5/30 | Weather last call
"""]]
@@ -92,15 +77,15 @@ Thu 10/18 | Weather last call
[[!table data="""
-Date | Time | Activity
-Fri 10/19 | Evening | Prep equipment and pack up toy hauler at Dave's house.
-Sat 10/20 | Morning | Depart from Dave's house for Brothers.
-Sat 10/20 | Afternoon | Arrive in Brothers, set up launch tower, prep rocket for flight, watch other people's rockets.
-Sat 10/20 | Evening | Final tower and LTC assembly and testing, final rocket assembly. Astronomy, after the moon goes down.
-Sun 10/21 | Morning | Rocket to pad, final system testing before flight. Those doing a single day launch leave from PDX.
-Sun 10/21 | Noon | Launch!
-Sun 10/21 | Afternoon | Recovery, debrief, pack, drive back to PDX
-Sun 10/21 | Evening | Unload rocket stuff at Dave's house.
+Date | Time | Activity
+Fri 6/01 | Evening | Prep equipment and pack up toy hauler at Dave's house.
+Sat 6/02 | Morning | Depart from Dave's house for Brothers.
+Sat 6/02 | Afternoon | Arrive in Brothers, set up launch tower, prep rocket for flight, watch other people's rockets.
+Sat 6/02 | Evening | Final tower and LTC assembly and testing, final rocket assembly. Astronomy, after the moon goes down.
+Sun 6/02 | Early | Rocket to pad, final system testing before flight.
+Sun 6/02 | 9:00am | Launch!
+Sun 6/02 | Afternoon | Recovery, debrief, pack, drive back to PDX
+Sun 6/02 | Evening | Unload rocket stuff at Dave's house.
"""]]
@@ -108,10 +93,7 @@ Sun 10/21 | Evening | Unload rocket stuff at Dave's house.
### ASAP!:
- 1. <del>Fix the spin can bearing (Rob)</del>
- 1. <del>CAN and USB latency testing (Dave+Andrew)</del>
- 1. <del>Have Chute Bag resown or rebuilt (Tim)</del>
- 1. <del>Motor bulkhead adapter update solid models based on new motor casing dimensions.</del>
+1. TBD
### Do Early: