summaryrefslogtreecommitdiff
path: root/CapstoneLv2b20051213.mdwn
blob: f50d275088a279092036092c1a33ab8d2cd0aa79 (plain)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
# Capstone Team Meeting 2005/12/13

## Deliverables

- The generic node front end: design and prototype
- Introduction (whitepaper)
- Design notes

## Schedule/Milestones

1. Review of current design
2. Detailed block diagram design (design review)
3. Schematics design (design review)
4. Board layout (design review)
5. Constructed prototype
6. Firmware demonstration
7. Measured performance

## Resources

For the class they need:

- Weekly progress reports
- Project proposal by end of January to me (high level)
- Project Design Specification turn in at the end
- Final Presentation
- How the project is partitioned?

## Andrew To Do

- Put some of Tim's design notes on the capstone pages (CapstoneLV2b)
- Figure out the media of the design notes
- Post the project proposal to the wiki