summaryrefslogtreecommitdiff
path: root/MeetingNotes11Jul02.mdwn
blob: 93884d3956fd31f460a38497c9dd6f273f6597f1 (plain)
1
2
3
4
5
6
7
8
9
10
11
12
13
## <a name="Thursday July 11th, 2002 Airfram"></a> Thursday July 11th, 2002 Airframe Team Workshop

----

**Participants:** Brian, Maggie, Tim, Jim and Cathy.

The second fin was layed up.<br /> Motor adapter centering ring fabrication begun.<br /> Threadcerting of aeroshell to aluminum frame begun.<br /> Came to consensus on motor retainer design.<br /> Discussed recovery system packing and fitting on nomex shield.<br />

Will meet again Monday to do 3rd fin.<br /> Maggie will work on nose cone prep over the weekend. <br /> Tim will work with avionics group to design patch antenna - aeroshell interface and umbilical system.<br /> Brian will work with Jim and Dennis on testing and analysis of launch clamps. <br />

Photos:<br /> 1) completed layup of first fin. Awaiting final shape.<br /> 2) Motor adapter centering ring prior to turning on lathe.<br /> 3) Aligning aero-shell on frame using backlighting.

<br />[[fin1final.jpg]]<br />[[centering.jpg]]<br />[[backlit.jpg]]