summaryrefslogtreecommitdiff
path: root/MeetingNotes25jul01.mdwn
blob: 5e25c6786a80399aba7f545b84b8f75ba0939e34 (plain)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
# <a name="Meeting Notes 7/25/01"></a> Meeting Notes 7/25/01

----

Well, we lost the real notes so here's a cap:

In attendance: Andrew, Nathan, Richard, James, Tim, Jamey, Dennis, Bart

----

## <a name="Assignments:"></a> Assignments:

Jamey = Ground Control Dot<br /> Larry = Flight Computer Dot<br /> Andrew = CAN Dot<br />

----

**Key Risk area: ANTENNAS** - 1.5GHz GPS and 2.4GHz 802.11b

----

## <a name="Minimum September Configuration:"></a> Minimum September Configuration:

Hardware: GPS + GPS antenna + IMU + FC + 802.11b + 802.11b antenna.<br /> Software: Take raw GPS and IMU data and log to memory and send to radio.<br />

----

## <a name="To do by next week / meeting (8/"></a> To do by next week / meeting (8/1/01):

James is going to look at the 520 docs and find the capabilities and challenges of getting RTLinux to run on it.<br /> Richard will work with James.<br /> Nathan will work on getting ATV stuff together.<br /> Tim is working on the IMU calibration.<br /> Andrew is working ont the IMU cal and the small microcontrollers and getting together the state machine from LV1b and also getting antenna contacts.<br /> Glenn is working on antennas, and giving us his life's savings.<br /> Larry is also giving us his life's savings and delving into RTLinux (get your box to Jamey) and working on the FCC waiver.<br /> Jamey is working on getting three RTLinux boxes up and running AND on the ground control software.<br /> Bart is getting three 802.11b cards and ISA adapters.<br />

-- [[AndrewGreenberg]] - 25 Jul 2001 <br />