summaryrefslogtreecommitdiff
path: root/launch10.mdwn
blob: afb3802a05d38b97fc24a7388432a78cfda9e54e (plain)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
# L-10 Fall 2012

[[!img LV2.3-October.png alt="L-10 Mission patch" class="picture"]]

**Date:** October 20-21 (in Central Oregon)

**Goals:** Launch LV2 with current roll control system along with new Atom flight computer, GPS, IMU, 802.11a WiFi, 2.4 GHz ATV and camera assembly.

<div style="font-size:2.0em">
      <script language="JavaScript">
        TargetDate = "10/21/2012 12:01 PM";
        BackColor = "white";
        ForeColor = "navy";
        CountActive = true;
        CountStepper = -1;
        LeadingZero = true;
        DisplayFormat = "L -%%D%% Days, %%H%% Hours, %%M%% Minutes, %%S%% Seconds.";
        FinishMessage = "Launch Day";
      </script>
      <script language="JavaScript" src="/countdown.js"></script>
</div>

# Logistics

## Pre-launch Timeline

From [[last week's meeting notes|news/2012-09-112/]]:

[[!table header="column" data="""
Date      | Activity
Tue 09/11 | Launch date decision
Fri 09/14 | Communication test day (success!)
          | 
Tue 09/18 | TBD
Fri 09/21 | Backup communication test day, LTC build day (Andrew out)
Sun 09/23 | Move rocket bits from Tim's to Dave's house
          |
Tue 09/25 | TBD (Andrew out)
Fri 09/28 | LTC build/integration day
          |
Tue 10/02 | FC done, LTC done, payload module done
Fri 10/05 | 1st integration test day @ Dave's house (Feature freeze, write checklists, 1st rocket/LTC integration, launch rocket with lightbulb, shore power, rocketready, etc) <br /> Whatever isn't ready, we're not going to fly: feature freeze.
          |
Tue 10/09 | Recovery system prep completed
Fri 10/12 | Integration test day @ Dave's house (Full comms integration day @ Tim's house)<br /> Final Checklist / Code freeze
          |
Tue 10/16 | Go/No Go decision, final logistics, etc.
Thu 10/18 | Weather last call
"""]]


## Launch weekend timeline


[[!table data="""
Date      | Time      | Activity
Fri 10/19 | Evening   | Prep equipment and pack up toy hauler at Dave's house.
Sat 10/20 | Morning   | Depart from Dave's house for Brothers.
Sat 10/20 | Afternoon | Arrive in Brothers, set up launch tower, prep rocket for flight, watch other people's rockets.
Sat 10/20 | Evening   | Final tower and LTC assembly and testing, final rocket assembly. Astronomy, after the moon goes down.
Sun 10/21 | Morning   | Rocket to pad, final system testing before flight. Those doing a single day launch leave from PDX.
Sun 10/21 | Noon      | Launch!
Sun 10/21 | Afternoon | Recovery, debrief, pack, drive back to PDX
Sun 10/21 | Evening   | Unload rocket stuff at Dave's house.
"""]]


## Things to do before launch:

### ASAP!:

 1. <del>Fix the spin can bearing (Rob)</del>
 1. <del>CAN and USB latency testing (Dave+Andrew)</del>
 1. <del>Have Chute Bag resown or rebuilt (Tim)</del>
 1. <del>Motor bulkhead adapter update solid models based on new motor casing dimensions.</del>
 
### Do Early:

 - <del>Full communications test</del>
 - Launch Tower Computer test
 - Rocket Tracks electronics (Andrew)
 - Rocket Tracks programming (RT Crew)
 - System Integration/Dress Rehearsal
 - Fix generator (Generator? which generator?)
 - Get camera module (Frank)

### Do closer to launch:

 - Clean NSR and reafix (Dan)
 - Reload line cutters (Dave)
 - Pack chutes (Tim)

## Procedures:

 - [[procedurebook]]